|
|
|
|
|
|
| Text for the above items : |
Gold Beach, Normandy, 6th June 1944 by David Pentland. Royal Engineers Churchill AVREs of 6th Assault Regiment, 81st Squadron and DD Shermans of the 4/7th Dragoon Guards. Both units were part of perhaps the most important formation involved in the British and Canadian landings, the 79th Armoured Division or Funnies. Composed of a variety of armoured vehicles, designed to support the beach assault troops, they included mine flails, bunker busters, carpet layers, and amphibious tanks. |
Gold Beach, Normandy, 6th June 1944 by David Pentland. Royal Engineers Churchill AVREs of 6th Assault Regiment, 81st Squadron and DD Shermans of the 4/7th Dragoon Guards. Both units were part of perhaps the most important formation involved in the British and Canadian landings, the 79th Armoured Division or Funnies. Composed of a variety of armoured vehicles, designed to support the beach assault troops, they included mine flails, bunker busters, carpet layers, and amphibious tanks. |
David and Goliath, Vernon, France, 27th August 1944 by David Pentland. Leading 30th Corps assault across the Seine at Vernon, 43rd Wessex Division gained an initial foothold on the east bank. Heroic efforts however by the Royal Engineers of 71st, 72nd and 73rd Field Companies, succeeded in constructing a Class 9 Bailey bridge (David, shown left) and a Second Class 40 bridge (Goliath, shown right) Despite constant enemy fire this amazing feat was achieved in only 2 days, and allowed 15/19th Hussars Cromwells and 4.7th Dragoons Guards Shermans to cross just in time to repulse a serious German counter attack by Tiger IIs of SS Panzer Abteilung 101. |
4th/7th Royal Dragoon Guards by Douglas Anderson. No text for this item |
David and Goliath by David Pentland. Vernon, France, 27th August 1944. Leading 30th Corps assault across the Seine at Vernon, 43rd Wessex Division gained an initial foothold on the east bank. Heroic efforts however by the Royal Engineers of 71st, 72nd and 73rd Field Companies, succeeded in constructing a Class 9 Bailey bridge (David, shown left) and a Second Class 40 bridge (Goliath, shown right) Despite constant enemy fire this amazing feat was achieved in only 2 days, and allowed 15/19th Hussars Cromwells and 4.7th Dragoons Guards Shermans to cross just in time to repulse a serious German counter attack by Tiger IIs of SS Panzer Abteilung 101. |
|
Contact Details |
Sign Up To Our Newsletter!
This website is owned by Cranston Fine Arts. Torwood House, Torwoodhill Road, Rhu, Helensburgh, Scotland, G848LE Contact: Tel: (+44) (0) 1436 820269. Email: cranstonorders -at- outlook.com
|